PROJECT PROFILE

Microsoft Data Center

Dublin, Ireland • Owner: Microsoft

Microsoft data center exterior
Microsoft Data Center – EU West Cloud Region
Active • Phase 2

Tier III+ hyperscale facility delivering 48 MW of critical IT capacity across two connected data halls.

LocationDublin, Ireland
Contract typeGMP with shared savings
General contractorContoso Builders JV
OwnerMicrosoft – Cloud Infrastructure
NTP2025-01-15
Substantial completion2027-02-28
Total contract value$420M
Approved change orders$27.8M
Original duration26 months
Forecast duration27.5 months
Overall progress45% complete
Last updated2026-03-01
Field reported

Scope mix (by contract value)

Core & shell 45%
MEP & controls 30%
White space fit-out 15%
Site & civil 10%
Cash Flow & Operating Runway

Net cash vs 12–16 week forecast and program minimums.

Minimum cash floor: $20M
Net cash position$26.4MCash + undrawn facilities – near-term obligations
Monthly net burn$4.1MAvg. last 90 days
Runway – 60 days6.7 monthsAt current burn rate
Runway – 90 days9.9 monthsIncl. committed draws
Billing & Receivables

WIP position, AR aging, and retainage exposure for this project.

Contract value (incl. COs)$420M
Billed to date$182.5M
Earned to date$189.6MUnderbilling: $7.1M
WIP positionUnderbilling

Project is $7.1M underbilled vs earned value. This is within program guardrails and aligns with owner's cash preferences.

Retainage exposureLow risk
Held to date$18.9M
Eligible to release$4.2M
Target release2026-09-30

Retainage burn-down plan coordinated with commissioning milestones and owner's funding calendar.

PROJECT MANAGEMENT ACTIVITY

Select a PM.

AC

Agentic PM 1

Docs / procurement / subcontracts

Owns document control, procurement pipelines, and subcontract execution so field teams always have the latest information.

Monday
Uploaded “IFC – Civil Package Rev 3” to Docs › IFC › Civil; notified Civil, Survey, and Earthworks.Mon 7:02 AMDocs & files
Received email from Surveyor: control points set, staking can start today; filed under Field › Survey.Mon 7:28 AMEmail
Sent ITB to Fire Protection bidders with scope notes; bids due Wed 2:00 PM.Mon 9:18 AMProcurement
Created subcontract draft “Site Concrete – Turnkey” with scope and schedule exhibits; status set to Internal review.Mon 10:41 AMProcurement
Tuesday
Issued Addendum 01 to all bidders: revised Division 03 spec section; acknowledgements 5/7 received.Tue 6:55 AMProcurement
Uploaded Submittal Register v1.4 to Project Controls › Logs; @mentioned MEP PM to confirm long-lead items.Tue 8:12 AMDocs & files
Received Structural Steel shop drawings (12 PDFs); routed to EOR; status set to Under review.Tue 10:06 AMDocs & files
Logged COI for Scaffold vendor; compliance check Pass; marked Approved for site access.Tue 2:24 PMDocs & files
Wednesday
Created folder structure “Submittals › 26 Electrical › Week 06”; set permissions for Electrical Sub.Wed 8:03 AMDocs & files
Received executed subcontract from Dewatering Sub; countersigned and marked Fully executed.Wed 10:17 AMProcurement
Sent “Temporary Facilities Plan Rev 1” to Fencing vendor; requested pricing within 48 hours.Wed 1:52 PMProcurement
Added new company “Nova Crane Services LLC” with insurance/WCB fields; tagged trade as Cranes.Wed 4:09 PMCoordination
Thursday
Uploaded Material Delivery Schedule (Rev 2) to Procurement › Long Lead; notified Superintendent.Thu 7:36 AMProcurement
Responded to email from Earthworks Sub confirming haul route and export ticket format; saved to Logistics.Thu 9:44 AMEmail
Issued PO-014 for jobsite dumpsters (12-week term); status set to Sent to vendor.Thu 1:21 PMProcurement
Received email from dumpster vendor confirming delivery Fri 7:00 AM; alerted Gate and Superintendent.Thu 3:58 PMEmail
Friday
Uploaded Permit set – Erosion & Sediment Control to Permits › ESC; shared to Owner portal.Fri 7:11 AMDocs & files
Logged 9-minute phone call with Steel detailer confirming RFI routing and submission cadence; notes saved.Fri 9:05 AMCall / meeting
Sent Fire Protection bid reminder email: bids due 2:00 PM; reattached addendum package.Fri 11:47 AMEmail
Closed document task: As-built template distributed to all trades; monthly upload due dates created.Fri 3:22 PMDocs & files